1.Product Description
The function of Senyou high productivity palm oil process sieving machinery is to separate the non oil solid (NOS) which consists of trash, large fibers and sand that are joined with crude oil.
2.Main Features
1).Boasting a robust and durable structure, this equipment supports the broadest spectrum of material screening applications.
2).It delivers enhanced processing capacity, minimizes screen blinding, and ensures consistent, high-efficiency operation with minimal downtime.
3).Featuring an extended screen service life, low power consumption, user-centric design, and reduced maintenance requirements.
4).Capable of single or multi-stage separation, it achieves maximum screening efficiency while occupying a compact footprint.
3.Specification
Senyou high productivity palm oil process sieving machinery
| No. | Model | SYU-1500-2S |
| 1 | Normal Power | 380V/50HZ |
| 2 | Motor Power | 2.2KW |
| 3 | Vibration Mode | Three Dimensional Vibration |
| 4 | Largest Vibration Force | 30000N |
| 5 | Amplitude | 2-4mm |
| 6 | Effective Screen Area | 1.696 m2 /layer |
| 7 | Screening decks | 2 |
| 8 | Decibels | ≦75db |
| 9 | Dimensions | Φ1470*1250 |
| 10 | Body Material | SUS304 Stainless Steel |
| 11 | Motor Material | Cast Iron |
| 12 | Surface Treatment | The Base Pickling,Passivation,Plastic-sprayed. |
| 13 | Application | palm oil, vegetable oil, castor oil, sunflower oil, rice bran oil, soybean oil, rapeseed oil, cottonseed oil, mustard oil, peanut oil. |
4.Setting
Step 1 Remove shipping brackets before start-up
Step 2 Install 4 supports on the base,
Step 3 Choose the suitable sieves and adjust the angel of motor’s weights
according to the material and duty
Step 4 Inspect whether springs, screws and other spare parts have been tightened
Step 5 Plug into the electricity, then check whether the running direction of motor is same as the indication
Step 6 Turn off the power for safety.
5.parts show

6.Package&Shipping
Senyou high productivity palm oil process sieving machinery:Export wooden case.Waterproof,anti-corrosion,difficult to burn,sturdy and durable.The production period is about 7 working days after received your payment.





